Versions Compared

Key

  • This line was added.
  • This line was removed.
  • Formatting was changed.

...

If the meters are flushed by Stream execution in Meter Processor , the period end of the flushed metered record is set to the time of the flush. The new Period start of the meter in the stream is also set to the time of the flush, and the Period end is calculated using the meter type Reset schedule.

Period start and Period end for a meter can be checked using a Meter Inspector.